FAQs

Lead time?

10-12 weeks

From the time you purchase to the time you can move in, it will be 10-12 weeks.

Warranty?

10 year warranty

Perch structures are constructed to last beyond 10 years but in the case that there is a structural problem, we will have a service professional come to your property to fix any issues. We offer this service for 10 years.

Returns?

Return policy

Our modular structures are built with the highest quality. In the case that something arrives damaged, we will send out a repair professional to fix it. There are no returns due to the high costs of shipping and installation so we will send a repair professional to your property to make sure everything is back to normal.

Foundation?

Customer responsibility

Spread Footings

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Slab Foundation

If you already have a hard foundation, this would be the best option to put your Mini-Office. If you do not have one, you can pour your own 4” deep foundation or hire a contractor to build one.

Pre-Manufactured Piers

These can be store bought at your local home improvement store. They need to be 18" thick and and placed on site as level as possible.

Insulation?

r-19 Value

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Shelving?

r-19 Value

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

White Oak

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Interior finish

White Oak

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Maple

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Exterior

Galvalume

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Corten

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Anodized

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Electrical

Customer responsibility

Dedicated Wall outlet

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Plug-In Power Cord

If you already have a hard foundation, this would be the best option to put your Mini-Office. If you do not have one, you can pour your own 4” deep foundation or hire a contractor to build one.

Shipping

From factory to your curb

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Arrives fully assembled

If you already have a hard foundation, this would be the best option to put your Mini-Office. If you do not have one, you can pour your own 4” deep foundation or hire a contractor to build one.

Installation

Customer responsibility

Forklift

Spread footings should be 18" diameter x 18" deep holes that are filled with leveling concrete from your local hardware store.

Crane

If you already have a hard foundation, this would be the best option to put your Mini-Office. If you do not have one, you can pour your own 4” deep foundation or hire a contractor to build one.